work begins on WYO 70 slide

Work Begins on WY 70 Slide
Work Begins on WY 70 Slide
Work Begins on WY 70 Slide
Work begins next week building a new, permanent roadway realignment to circumvent a slide that destroyed a section of WYO 70  between Baggs and Riverside in south-central Wyoming. The damage, which was discovered by a snowmobiler on May 30, 2011, is 600 feet long and located just west of the overlook at mile post 30.